Last updated
Geer Road construction will follow drivers into the new year. Turlock’s current closure list carries two stretches near Golden State Boulevard through Jan. 8, 2027. A separate East Marshall Street closure now runs through Dec. 4, with local and emergency access only.
For a school run, a medical appointment or a quick shopping stop, the street limits matter more than the project name. Here is what the city currently lists and where to look when the work changes.
The Four Notices to Know
The city’s Road Closures & Major Delays list identifies these work areas. All four notices list 24-hour closure windows.
- Geer Road, Hedstrom Road to Sai Lane. Inside lanes in both directions are affected by median work and pavement reconstruction. The listed window ends Dec. 4, 2026.
- East Marshall Street, North Berkeley Avenue to North Johnson Road. Road construction closes the segment through Dec. 4, 2026. Detours are posted, with local and emergency access only.
- Geer Road, Golden State Boulevard to Wayside Drive. Inside-lane work is listed through Jan. 8, 2027. This entry also carries a local-access-only restriction.
- Geer Road, Golden State Boulevard to East Hawkeye Avenue. Inside lanes in both directions are listed for median improvements and roadway reconstruction through Jan. 8, 2027.

Check the Stretch, Then Plan the Trip
The two Golden State Boulevard entries have the same end date and describe overlapping work limits. Treat them as separate city notices when checking your destination. Adding their lengths together would give a misleading impression of how much road is under construction.
If you normally cut through East Marshall, plan to follow the signed detour. If your destination is within the affected block, check its access before leaving. A lane restriction on Geer can also change which approach is convenient for an errand. Allow extra time when you have a fixed arrival time.
The dates describe the city’s planned work windows. Use the posted traffic controls at the site for the route available when you arrive. A navigation app can help plan a trip, but the road signs tell you which movements are currently allowed.
Our Geer Road guide covers the corridor beyond this construction update. For Friday through Sunday plans, the weekend events roundup has the venues and arrival times.
Why the City Has a Roads Program
Turlock’s Roads Program overview describes a broader effort to preserve, rehabilitate and rebuild existing streets. Voters approved Measure A, a three-quarter-cent general sales tax, in November 2020. The city says its 2021-22 budget directed half of the revenue toward road rehabilitation and repeated that commitment in the next two budgets.
The planning also included surveying streets in December 2021 and January 2022. Vehicles collected pavement and topographic information using laser crack measurement and LiDAR equipment. That work helped the city assess pavement condition and identify rehabilitation projects. The program page links to presentations and project information for residents who want the background behind the construction.
Get Changes in Your Inbox

The city offers email subscriptions for road closure notices. Its closure page says emails are sent at 4 p.m. on days a notice is posted or updated. A free city account is required to subscribe.
For a question about access to a particular property, call the Engineering Division at 209-668-5520. Its listed office hours are Monday through Friday, 8 a.m. to 5 p.m. The office is at 156 S. Broadway, Suite 150, Turlock.
Bookmark the city’s live closure list if either street is part of your regular route. It is the place to check for a revised end date before your next trip.
How Has the Work Affected Your Route?
Which part of your regular route has needed the most extra time? Compare notes with other Turlock drivers on Facebook.